12.4 Outdoor Unit

12.4.1
Install the Outdoor Unit
After selecting the best location, start installation to Indoor/Outdoor Unit Installation Diagram.
1
Fix the unit on concrete or rigid frame firmly and horizontally by bolt nut (ø10 mm).
Make sure unit install in balance level to ensure that water flow out from unit drainage hole.
2
When installing at roof, please consider strong wind and earthquake.
Please fasten the installation stand firmly with bolt or nails.
A
12.4.2
Connect the Piping
12.4.2.1
Connecting the Piping to Indoor
For connection joint location at outside building
Please make flare after inserting flare nut (locate at
joint portion of tube assembly) onto the copper pipe.
(In case of using long piping)
Connect the piping
Align the center of piping and sufficiently tighten
the flare nut with fingers.
Further tighten the flare nut with torque wrench in
specified torque as stated in the table.
Spanner or
Wrench
12.4.2.2
Connecting the Piping to Outdoor
Decide piping length and then cut by using pipe cutter.
Remove burrs from cut edge.
Make flare after inserting the flare nut (locate at valve)
onto the copper pipe. Align center of piping to valve
and then tighten with torque wrench to the specified
torque as stated in the table.
B
Torque
wrench
Model
Z20***, XZ20***
Z25***, XZ25***
570 mm
Z35***, XZ35***
Z42***
Z50***, XZ50***
613 mm
Z71***
For connection joint location at inside building
Refer to indoor installation instruction.
Do not overtighten, overtightening may cause gas leakage
Piping size
6.35 mm (1/4")
9.52 mm (3/8")
12.7 mm (1/2")
15.88 mm (5/8")
19.05 mm (3/4")
56
A
B
C
105 mm
18.5 mm
131 mm
24 mm
Torque
[18 N•m (1.8 kgf•m)]
[42 N•m (4.3 kgf•m)]
[55 N•m (5.6 kgf•m)]
[65 N•m (6.6 kgf•m)]
[100 N•m (10.2 kgf•m)]
D
320 mm
360.5 mm