Loading And Unloading Operation - Promeba PC-750 Series User Manual

Electric stretcher, stretcher support
Hide thumbs Also See for PC-750 Series:
Table of Contents

Advertisement

USER GUIDE //
STRETCHER PC-750 + SUPPORT PB-720
Review 07/20
03
OPERATION
03.8

Loading and unloading operation

Starting from the position in which the support has been left after the loading of the
stretcher into the ambulance (1):
UNLOADING
· Pull the lever of the anchor point towards the left (A).
· Automatically the stretcher will be free. Push it out the ambulance (B) until the su-
pport are totally extract (2).
· Use the control panel to power the stretcher. WAIT 2 SECONDS to activate the system
and later push the UP button (C).
· Once the stretcher will be in its highest position, which will be free (4).
· Move away the stretcher in straight line until being completely out of the support.
· Again, pick the support up into the ambulance by the lever placed on right side (C).
LOADING
· Pull the support out the ambulance by lever of the anchor point (A).
· Push the support by lateral handles until its maximum.
· Move the stretcher closer towards the support in straight line (5) make sure the whe-
els are placed like the image (D).
· Push the DOWN button on the control panel of the stretcher (E) and after push right
lateral lever of the support (C) to put the set into the ambulance.
· Secure the stretcher is fasten on the anchor point (A) and anchor point is on close
position.
· Verify the stretcher are charging, pushing the POWER button.
A
C
UP
UP
E
DOWN
DOWN
THE FRONT WHEELS OF THE STRETCHER MUST BE LOCKED WHEN THE LOADING/UNLOADING OPERATION ARE
EXECUTED.
ON THE CONTRARY, IT IS POSSIBLE IMPORTANT ELEMENTS OF THE STRETCHER COULD BE DAMAGED.
24
B
D
C
1
2
4
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pb-720 seriesPc-750Pc-751Pc-755Pb-720Pb-725

Table of Contents