General Preparations - Wolf CFK-1 Installation, Operating And Maintenance Instructions

Rooftop installation with aluplus installation system, roof integration flat roof installation with aluplus installation system. high performance solar collector.
Table of Contents

Advertisement

Transport and storage
Installation
Required tools
Preparations prior to installation
Sensor well
Flow connection piece
Collector
gaskets
Grub screws
Return connection
M8x30
piece (obligatory for
roof integration)
3062815_0110

5. General preparations

-
Only handle and store the collector pile using the packing strips and pallets.
-
Never move more than 16 collectors in a single pile and never store more
than 24 collectors in a single pile.
-
Never move collectors with the glass facing down.
-
To prevent damage, never carry collectors at the collector connectors or put
NB
them down on the connectors.
-
Never place the collector back onto uneven surfaces.
-
Store collectors only in dry places that are free of dust.
-
Cover the glass side of the collectors until the collectors are
commissioned.
-
We recommend the use of transport handles (available as accessories).
The installation and commissioning must only be carried out by authorised contractors.
This contractor will be responsible for the correct installation and commissioning.
The collector connections, even those of dry collectors, can become very hot during the
installation. Wear protective gloves as there is a risk of injury from burns.
The following materials and tools are required for an easy and safe collector
installation:
1 Hammer
1 Tape measure
1 Pencil / chalk
2 Screwdrivers / spanner SW 13
1 Wood drill bit approx. 5 mm (only roof integration)
1 Angle grinder with stone cutting disc
2 Open-ended spanners SW 30
1 Adjustable pliers
1 Jig saw (where the roof is already planked in)
Roof outlets for the solar lines (e.g. ventilation tile; cut to size with an angle
grinder)
Protective conduits (sensor lead, pipework)
Anti-falling protection(s)
Crosshead bit
The following tasks should be carried out prior to the collectors being moved
onto the roof (exception: Flat roof installation).
Compensator
NB: Fit compensators only to the short connectors.
Connect the collectors alternately across (up to 10 collectors).
Prior to joining the connections, check whether the collector seals are inside
each fitting.
When fitting the connection pieces, compensators and plugs, always counterhold
the union nut on the collector.
Remove the sensor well from the control unit carton and insert into the flow
connector.
Respectively insert 2 M8x30 grub screws fully into the lower tray edge.
7