Wolf CFK-1 Installation, Operating And Maintenance Instructions page 43

Rooftop installation with aluplus installation system, roof integration flat roof installation with aluplus installation system. high performance solar collector.
Table of Contents

Advertisement

Service check list
Collector inspection
- Visual collector inspection
- Visual inspection of the collector fixings
- Visual inspection for potential leaks in the roof
- Visual inspection of the thermal insulation on pipework
Solar heating circuit
- Visual inspection for potential leaks in the solar circuit (joints)
- Colour check of the ANRO heat transfer medium
- pH value test of the ANRO heat transfer medium only in case
the medium has turned brown; poss. replacement
- Frost protection level of the heat transfer medium checked
- Safety valve tested
- Solar expansion vessel pre-charge pressure tested
(for this, shut off the expansion vessel)
- In case of noisy pumps or system pressure fluctuations
vent the system; for this, block the gravity brake
- System pressure in a cold system state (at 17 m system head) 3 bar.
- Reactivate the gravity brake
Solar cylinder and DHW circuit
- Protective anode inspection
- Checking for scale build-up in the cylinder and on the thermostatic
mixing valve; poss. carry out de-scaling
- Checking the anti-scalding protection
(thermostatic mixing valve or via the maximum cylinder temperature limit)
Control systems
- Checking control parameters and display values for plausibility
- Solar circuit pump running and circulates
(poss. adjustment and checking on the flow meter)
- Temperature of boiler boosting tested
- Option: DHW circulation pump runtime checked
3062815_0110
21. Service check list
Date:
Date:
O
O
O
O
O
O
O
O
O
O
O
O
pH_____
pH_____
_____°C
_____°C
O
O
_____bar
_____bar
O
O
_____bar
_____bar
O
O
O
O
O
O
O
O
O
O
_____l/min
_____l/min
_____°C
_____°C
O
O
43

Advertisement

Table of Contents
loading

Table of Contents