Roof Integration, Interlocking Tile; Standard Delivery; Standard Dimensions - Wolf CFK-1 Installation, Operating And Maintenance Instructions

Rooftop installation with aluplus installation system, roof integration flat roof installation with aluplus installation system. high performance solar collector.
Table of Contents

Advertisement

Standard delivery

Installation parts
Left hand
cover panel
Bottom mounting rail
Flashing tape
base L.h.
Flashing tape
Standard dimensions for
determining the position of
the collector array
Collector array width
Width with cover frame
Number of collectors
Width of the collector array [m]
Width with cover frame [m]
*)Tiles to be removed per row of tiles:
Cover width 30 cm
Dim. "X" [cm]
Cover width 20 cm
Dim. "X" [cm]
*) After "centring" the mounting rail we recommend to shift the rail 7 cm to the left or right. This ensures that on one side half a tile and on the
opposite side a whole tile can be used.
18

13. Roof integration, interlocking tile

For safety reasons, the [German] roofing contractor's association specifies a
NB
covered substrate with bitumen sheeting or other suitable material below the
collector area to prevent the ingress of moisture in case of leaks. This must
terminate in the roof gutter.
Top mounting rail
Intermediate
panels
Connecting rail
(with return for flashing tape)
Triangular
Timber spacer of 15 to 30 mm
sealing tape
height to match to the battens
Width with cover frame
X (0.5-12 cm)
2
2.36
2.74
8
0.5
12
0.5
Edge
protector
Collector array width
3
4
5
3.49
4.62
5.75
3.87
5.00
6.03
14
18
22
4
7.5
11
14.5/ 7
18
24
29
4
7.5
1
Top cover panels
Right hand
cover panel
Flashing tape base, R.h.
Screws, nuts, grub screws,
woodscrews in a bag
X (0.5-12 cm)
6 *)
7
8
9
6.88
8.01
9.14
10.27
7.26
8.39
9.52
10.65
25
29
33
37
3
6.5
10
35
41
46
52
4.5
8
1.5
5
3062815_0110
10 *)
11.40
11.78
39
6
58
8.5

Advertisement

Table of Contents
loading

Table of Contents