Roof Integration - Interlocking Tile - Wolf CFK-1 Installation, Operating And Maintenance Instructions

Table of Contents

Advertisement

Standard delivery
Installation parts
Left hand skirt
Bottom mounting rail
Flashing tape
base, left
Flashing tape
Standard dimensions for
determining the position of the
collector array
Position the collector array so that
the roof tiling can be completed as
far as possible using whole or half
tiles, without cutting.
Width incl. visible edging panels
Width incl. skirt
Remove one extra row of tiles
to provide sufficient space for
installing.
Number of collectors
Width incl. visible edging panels [m]
Width incl. skirt [m]
Tiles to be removed per row of tiles:
Skirt width 30 cm
Skirt width 30 cm
18

Roof integration - Interlocking tile

For safety reasons, the [German] roofing contractor's association specifies a
CAUTION
covered substrate with bitumen sheeting or other suitable material below the
collector area to prevent the ingress of moisture in case of leaks. This must
terminate in the roof gutter.
Top mounting rail
Connecting rail
(with return for flashing tape)
Triangular
sealing strip
1
1.23
1.57
6
8
Edge
protector
Intermediate
panels
Wooden spacer of
15 to 30 mm height to
match to the battens
Width of visible
sheet metal
Width incl. skirt
< 12 cm
2
3
4
5
2.36
3.49
4.62
5.75
2.74
3.87
5.00
6.03
10
14
18
22
12
18
24
29
Top skirts
Right hand skirt
Flashing tape base, right
Screws, nuts,
grub screws,
wood screws in the bag
< 12 cm
6
7
8
9
6.88
8.01
9.14
10.27 11.40
7.26
8.39
9.52
10.65 11.78
25
29
33
37
35
41
46
52
3062815_201508
30-60°
10
39
58

Advertisement

Table of Contents
loading

Table of Contents