Installation
3.8 Installing the SeeLevel II
18 SeeLevel II Installation: Garnet SeeLevel Tank Sensor Example
Follow the instructions for your sensor model.
I
To install the SeeLevel II tank monitor:
1. Connect the tank sensor black wires to the ground.
2. Connect the tank sensor blue wires to the module.
3. Connect the red wire from the module to the 12 VDC
power supply. The Garnet module uses this 12V
power wire to monitor the battery voltage readings.
4. Connect the black wires from the module to the
ground.
5. Connect the green wire from the module to the
positive wire of the mechanical gauge.
6. Connect the module to the RVC network using the
separate connector for the RVC communication
positive and negative wires.
16
7. Follow the schematics in order to wire the sensors
and the mechanical gas gauge.
8. Refer to the Garnet SeeLevel Sensor manuals to cut
the tab for each type of sensor (fresh, gray, and
black).
Dometic Interact
EN