Operation Procedure; Start To Test New Components; Testing Zone Is Completed; Test Part Is Completed - PCE Health and Fitness PCE-HT 224E Operation Manual

Concrete test hammer
Table of Contents

Advertisement

1.6.

Operation Procedure

1.6.1. Start to test new components

After startup, press confirm key to enter main interface, choose "test mode" and enter,
then choose "test a new component" interface, after entering, the test of a new component
is started, and you cannot return to top level menu at this moment. The default standard
parameters setting: component name GJXXX, test times 16, number of testing zones 16,
national standard-non pumping (national unified curve GB/T23-2001), horizontal zero
degree, side, carbonization depth 0.0mm are users' frequently-used setting options, as the
default standard setting convenient for test personnel to use. After the setting is completed,
choose "ok" to enter test interface,thus the test starts. The apparatus will save the
parameters and current test condition of the setting automatically; If restart the computer
after turning it off, the unfinished test before turning off the computer can be continued.
During the test process, if some parameters shall be corrected. Press confirm key to enter
main interface, and choose "test mode", and then choose "testing zone set" interface. On
this interface, test angle, casting surface and strength-measuring curve can be modified.
After modification, choose "ok" to exit, and the apparatus will save the corrected content
automatically.

1.6.2. Testing zone is completed.

If the recoiling times reach the set test times, the testing zone test is completed. Apparatus
prompts: "testing zone is completed" and it will enter the next testing zone after a 3-second
stop.

1.6.3. Test part is completed

When finishing the setting of the last testing zone, the test part is completed. Then the
apparatus enters test part completion interface. In this interface, users can choose to: check
the testing zone result, check test part result, measure new test part and measure the
current testing zone again.
1.7.

Calibration Test

Calibration test is a test, according to the relevant provisions of verification and rebound
apparatus calibration experiment in Regulations, in order to test the correction of testing
result of rebound apparatus. According to Regulations, the calibration value of rebound
apparatus shall be kept between 80±2, and specific calibration interface is set in the
apparatus, convenient for users to conduct routine calibration verification before carrying
out the test. After entering the interface, according to the relevant provisions of rebound
apparatus calibration experiment, conduct 4 groups of recoiling test (4 times for each
group). After the test, press confirm key to exit.

Advertisement

Table of Contents
loading

Table of Contents