Connect Wire Of Indoor Unit; Bind Up Pipe - Tadiran Telecom SMVH09A-2A1B1NA Service Manual

Table of Contents

Advertisement

Installation Manual
Step 7: Connect wire of indoor unit
1. Open the panel, remove the screw on the wiring cover and then take down the cover.
panel
2. Make the power connection wire go through the cable-cross hole at the back of indoor unit and then pull it out from the front
side.
3. Remove the wire clip,connect the power connection wire to the wiring terminal according to the color, tighten the screw and then
fix the power connection wirewith wire clip.
4. Put wiring cover back and then tighten the screw.
5. Close the panel.
Note:
● All wires of indoor unit and outdoor unit should be connected by a professional.
● If the length of power connection wire is insufficient, please contact the supplier for a new one. Avoid extending the wire by
yourself.
● For the air conditioner with plug,the plug should be reachable after finishing installation.
● For the air conditioner without plug, an air switch must be installed in the line. The air switch should be all-pole parting and
the contact parting distance should be more than 3mm.
Step 8: Bind up pipe
1. Bind up the connection pipe, power cord and drain hose with the band.
2. Reserve a certain length of drain hose and power cord for installation when binding them.
When binding to a certain degree, separate the indoor power and then separate the drain hose.
indoor unit
3. Bind them evenly.
4. The liquid pipe and gas pipe should be bound separately at the end.
Note:
● The power cord and control wire can't be crossed or winding.
● The drain hose should be bound at the bottom.
22
screw
wiring cover
indoor and
outdoor power cord
gas
pipe
liquid pipe
band
drain hose
Back
Lock nut
Conduit mounting
Conduit
bracket
connection pipe
indoor power cord
La
Lb
S
red
white
black
yellow-
(brown)
(blue)
green
Outdoor unit connection
drain hose
band

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents