7.4 Check after installation

Check according to the following requirement after finishing installation.
Has the unit been installed firmly?
Have you done the refrigerant leakage test?
Is heat insulation of pipeline sufficient?
Is water drained well?
Is the voltage of power supply according to the voltage marked on the
nameplate?
Is electric wiring and pipeline installed correctly?
Is the unit grounded securely?
Does the power cord follow the specification?
Is there any obstruction in the air inlet and outlet?
The dust and sundries caused during installation are removed?
The gas valve and liquid valve of connection pipe are open completely?

7.5 Test operation

1. Preparation of test operation

● The client approves the air conditioner.
● Specify the important notes for air conditioner to the client.

2. Method of test operation

● Put through the power, press ON/OFF button on the remote controller to start operation.
● Press MODE button to select AUTO, COOL, DRY, FAN and HEATto check whether the operation is normal or not.
● If the ambient temperature is lower than 16℃ , the air conditioner can't start cooling.
24
Items to be checked
Possible malfunction
The unit may drop, shake or emit noise
It may cause in sufficient cooling(heating)
capacity.
It may cause condensation and water dripping.
It may cause condensation and water dripping.
It may cause malfunction or damaging the parts.
It may cause malfunction or damaging the parts.
It may cause electric leakage
It may cause malfunction or damaging the parts.
It may cause in sufficient cooling(heating)
capacity.
It may cause malfunction or damaging the parts.
It may cause in sufficient cooling(heating)
capacity.