www.ti.com
2.2
Hardware Setup Procedure
A typical test setup using the ADC08L060EVM and TSW1400EVM is shown in
setup used for the quick-start procedure. The rest of this section describes the hardware setup steps.
Power
Analog Input
Switch
Low Noise
Signal Generator
10.1 MHz
Vin = -1 dBFS
10-MHz
Bandpass Filter
Low Noise
Power Supply
+5VDC @3A
2.2.1
TSW1400EVM Setup
First, set up the TSW1400EVM using the following steps:
1. Connect the ADC08L060EVM to the TSW1400EVM connecting pin 1 of the CMOS_INTERFACE (J1)
to pin 1 of ADC08L060EVM output data (J1).
2. Connect the power cable to connector J12 (5 V IN) to the TSW1400EVM.
3. Connect the mini-USB cable to the USB connector (J5).
4. Turn on the power supply. Flip the power switch (SW7) to the ON position. The board should draw
around 0.5 A after power up. This will increase to around 1.7 A when loaded with firmware.
SLAU712 – February 2017
Submit Documentation Feedback
ADC08L060
TSW1400
EVM
EVM
Figure 2. Quick-Start Test Setup
Copyright © 2017, Texas Instruments Incorporated
Figure
PC Computer
Running HSDC Pro
Mini-USB to
USB-A Cable
Copyright © 2017, Texas Instruments Incorporated
ADC08L060 Evaluation Module
Quick-Start Guide
2. This is the test
x
x
x x x
x x x
x x x
x x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
Copyright © 2017, Texas Instruments Incorporated
5
Need help?
Do you have a question about the ADC08L060EVM and is the answer not in the manual?