2.2

Hardware Setup Procedure

A typical test setup using the ADS54J69EVM and TSW14J56EVM is shown in
setup used for the quick start procedure. The rest of this section describes the hardware setup steps.
Analog Input
Low-Noise
Signal Generator
170 MHz, +15 dBm
170-MHz
Bandpass
Filter
2.2.1
TSW14J56EVM Setup
First, setup the TSW14J56EVM using the following steps:
1. Connect the ADS54J69EVM to the TSW14J56EVM using the FMC connectors.
2. Connect one end of the provided 5-V power supply cable to connector J11 (+5 V IN) and the other end
to a +5 VDC source with a minimum current rating of 3 A. Turn on the power supply.
3. Connect the included USB cable between the host computer and USB connector (J9).
4. Flip the power switch (SW6) to the ON position.
SLAU662B – January 2016 – Revised May 2016
Submit Documentation Feedback
Low-Noise
Power Supply
5 VDC @ 3 A
5-VDC Power Supply Cable
BINP
ADS54J69
AINP
EVM
Figure 2. Quick Start Test Setup
Copyright © 2016, Texas Instruments Incorporated
Figure
Mini-USB Cable
USB 3.0 Cable
Power
Switch
Low-Noise
TSW14J56EVM
Power Supply
5 VDC @ 3 A
Quick Start Guide
2. This is the test
PC Running
HSDC Pro
5
ADS54J69EVM

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ADS54J69EVM and is the answer not in the manual?

This manual is also suitable for:

Ads54j69

Table of Contents