baltur TBG 80 LX ME /V Instruction Manual For Installation, Use And Maintenance page 68

Progressive/modulating two-stage gas burners
Table of Contents

Advertisement

Available languages

Available languages

ENGLISH
• Slightly raise the gas delivery connection (30) and remove the enti-
re mixing unit in the direction indicated by the arrow.
• Having completed the maintenance work, replace the combustion
head, following in reverse order the operations described above,
after having checked the correct position of ignition and ionisation
electrodes.
CAUTION / WARNINGS
When closing the burner, gently pull towards the electrical pa-
nel, putting the two ignition and ionisation cables slightly in ten-
sion, then arrange them into their housings (29) (figure 2).This
will ensure that the two cables do not get damaged by the fan
during burner operation.
22 / 44
0006081328_202001

Advertisement

Chapters

Table of Contents
loading

Table of Contents