EAE EE-C18E Installation, Operation, And Parts Manual

Two post lift, electrical release lifting capacity 8000kg

Advertisement

Quick Links

Model No. EE-C18E
                                                                                                               
Two Post Lift,
Electrical Release
Lifting Capacity 8000KG
     
Please read this entire manual carefully and completely before installation or operation of the lift.
                                                                                               
 
Distributed by
                                       
 
 
 
Installation, Operation
and Parts Manual
 
DATE:08/12/2017
   
                   
 
 
 
 
 

Advertisement

Table of Contents
loading

Summary of Contents for EAE EE-C18E

  • Page 1                                                                                                 Model No. EE-C18E  ...
  • Page 2 Installation, Operation and Parts Manual EE-C18E IMPORTANT NOTES      Before start up, connecting and operating EAE products, it is absolutely essential that the operating instructions/owner’s manual and, in  particular the safety instructions are studied carefully. By doing so you can eliminate any uncertainties in handling EAE products and thus  associated safety risks up front; something which is in the interest of you own safety and will ultimately help avoid damage to the device,  When an EAE product is handed over to another person, not only the operating instructions but also the safety instructions and  information on its designated use must be handed over to the person.    By using the product you agree the following conditions:    Copy right  The enclosed instructions are the property of EAE or its supplier, and are protected against duplication and reproduction by copyright laws,  international agreements, and other domestic legislation. The reproduction or disclosure of instructions or an extract thereof is prohibited  and offenders are liable to prosecution; EAE reserves the right or initiates criminal proceedings and asserts claims for damages in the event  of infringements.    Warranty  The use of non‐approved hardware will result in a modification of our products and thus to the exclusion of any liability or warranty, even if  such hardware has been removed again in the interim.    It is not permissible to make any changes to our products and these are not only to be used together with genuine accessories and genuine  replacement parts. Otherwise any warranty claims will be invalid.    Liability    The liability of EAE is limit to the amount that the customer has actually paid for this product. This exclusion of liability does not apply to  damages caused through willful misconduct or gross negligence on the part of EAE.    All information in this manual is believed to be correct at time of publication.  EAE reserves the right to amend and alter technical data and composition without prior notice.    Please confirm at time of ordering.   ...
  • Page 3: Table Of Contents

    Installation, Operation and Parts Manual EE-C18E IMPORTANT NOTES ............................ 2  SAFETY NOTES .............................. 4  1.1 Operation of lifting platforms ..........................  4   1.2 Checking of the lifting platforms  ..........................  4   1.3 Important safety notices ............................  5   1.4 Warning labels ...............................  6   1.5 Potential safety risks ..............................  7   1.6 Noise level ................................  7   PACKING, STORAGE AND TRANSPORTATION ..................... 8  2.1 The lift was dismantled into the following 3 parts for transportation  ..............  8   2.2 Storage  ...................................  8   2.3 Opening the packs  ..............................  8  ...
  • Page 4: Safety Notes

    Installation, Operation and Parts Manual EE-C18E SAFETY NOTES    1.1 Operation of lifting platforms    This lift is specially designed for lifting motor vehicles. Users are not allowed to use it for any other purposes. The applicable national  regulations, laws and directives must be observed.    Only users aged 18 or above who have been instructed on how to operate the lifting platform and have proven their ability to do so to the  owner are to be entrusted with unsupervised operation of lifting platforms. The task of operating the lifting platforms must be granted in  writing.    Before loading a vehicle onto the lift, users should study the original operation instructions and familiarize themselves with the operating  procedures in several trial runs.    Lift vehicle within the rated load. Don’t attempt to raise vehicles with excessive weight. 1.2 Checking of the lifting platforms    Checks are to be based on the following directives and regulations:   Basic principles for testing lifting platforms   The basic health and safety requirement   The applicable accident prevention regulations    The checks are to be organized by the user of the lifting platform. The user is responsible for appointing an expert or qualified person to  perform checking. It must be ensure that the person chosen satisfies the requirements.  The user bears special responsibility if employees of the company are appointed as experts or qualified persons. 1.2.1 Scope of checking    Regular checking essentially involves performing a visual inspection and a functional test. This includes checking the condition of the  components and equipment, checking that the safety systems are complete and functioning properly and that the inspection log book is  completely filled in. The scope of exceptional checking depends on the nature and extent of any structural modification or repair work.   ...
  • Page 5: Important Safety Notices

    Installation, Operation and Parts Manual EE-C18E 1.3 Important safety notices    1.3.1 Recommed for indoor use only. DO not expose the lift to rain, snow or excessive moisture.    1.3.2 Only use this lift on a surface that is stable and capable of susutaining the load. Do not install the lift on any asphalt surface.    1.3.3 Read and understand all safety warnings before operating the lift.  1.3.4 Do not leave the controls while the lift is still in motion.  1.3.5 Keep hands and feet away from any moving parts. Keep feet clear of the lift when lowering.    1.3.6 Only these properly trained personnel can operate the lift.    1.3.7 Do not wear unfit clothes such as large clothes with flounces, tires, etc, which could be caught by moving parts of the lift.  1.3.8 To prevent evitable incidents, surrounding areas of the lift must be tidy and with nothing unconcerned.    1.3.9 The lift is simply designed to lift the entire body of vehicles, with its maximum weight within the lifting capacity.  1.3.10 Always insure the safety locks are engaged before any attempt to work near or under the vehicle. Never remove safety related  components from the lift. Do not use if safety related components are damaged or missing.  1.3.11 Do not rock the vehicle while on the lift or remove any heavy component from vehicle that may cause excessive weight shift.  1.3.12 Check at any time the parts of the lift to ensure the agility of moving parts and the performance of synchronization. Ensure regular  maintenance and if anything abnormal occurs, stop using the lift immediately and contact our dealers for help.  1.3.13 Lower the lift to its lowest position and do remember to cut off the power source when service finishes.  1.3.14 Do not modify any parts of the lift without manufacturer’s advice.  1.3.15 If the lift is going to be left unused for a long time, users are required to:  a. Disconnect the power;  b. Empty the oil tank;    c. Lubricate the moving parts with hydraulic oil.    WARNING:The warnings ,cautions and instructions discussed in this instruction manual cannot cover all possible conditions and  situations that may occur. It must be understood by the operator that common sense and caution are factors which cannot be built into  this product, but must be supplied by the operator.     ...
  • Page 6: Warning Labels

    Installation, Operation and Parts Manual EE-C18E 1.4 Warning labels                             ...
  • Page 7: Potential Safety Risks

    Installation, Operation and Parts Manual EE-C18E 1.5 Potential safety risks  1.5.1 Mains voltage    nsulation damage and other faults may result in accessible components being live    Safety measures:     Only ever use the power cord provided or a tested power cord.     Replace wires with damaged insulation.     Do not open the operating unit.    1.5.2 Risk of injury, danger of crushing  In the event of excessive vehicle weight, incorrect mounting of the vehicle or on removing heavy object, there is a risk  of the vehicle falling off or tipping up.    Safety measures:     The lift is only ever to be employed for the intended purpose.     Carefully study and heed all the information given in Section 1.4.     Observe the warning notices for operation.    1.6 Noise level    Noise emitted during operating the lift should be less than 70dB. For your health consideration, it is suggested to place a noise detector in ...
  • Page 8: Packing, Storage And Transportation

    Installation, Operation and Parts Manual EE-C18E PACKING, STORAGE AND TRANSPORTATION  Packing, lifting, handling, transporting operations must be performed only by experienced personnel with  appropriate knowledge of the lift and after reading this manual.        2.1 The lift was dismantled into the following 3 parts for transportation    Name  Packed by    Dimension(mm)  Weight(kg)/PCS  Quantity  Lift ‐C18  Steel brackets  3200x1400x940      2150  1  Extension post –C18  Bubbled film  2000x500x730  235  1  Power unit ‐C18  Carton  1050x200x350  28  1  2.2 Storage    The packs must be kept in a covered and protected area in a temperature range 0f ‐10℃to +40℃. They must not be exposed to direct ...
  • Page 9: Products Descriptions

    Installation, Operation and Parts Manual EE-C18E PRODUCTS DESCRIPTIONS    3.1 General descriptions      The lift is powered by an electro‐ hydraulic system. The gear pump delivers hydraulic oil to oil cylinders and pushes upwards its piston. The  piston drives to raise the carriages and the lifting arms. During lifting process, the mechanical safety locking unit ensures no slipping in case      of failure hydraulic system. 3.2 Construction of the lift    1. extending post    2.power unit    3.power side post    4.crossbeam      5.steel cable    6.secondary post    7.chain    8.hydraulic cylinder    9.carriage      10.swing arm   ...
  • Page 10: Dimensions

    Installation, Operation and Parts Manual EE-C18E 3.4 Dimensions     ...
  • Page 11: Safety Devices Descriptions

    Installation, Operation and Parts Manual EE-C18E 3.5 Safety devices descriptions    POS.  Name    Function    1  Swing arm lock  Ensure the swing arms are locked and avoid being swinging in working process.  2  Rubber adapter pad    Safe rubber contact with the wheel base of lifted vehicle.  3  Protect user’s feet from entering into danger areas that may cause pinching or  Feet protection bar    shearing.    4  Mechanical safety locking unit    Catch the carriages in case of hydraulic failure  5  Steel cable    Ensure both carriage can work synchronously.    6  Max height limit switch    Stop rising at maximum rated height.   ...
  • Page 12: Installation Instructions

    Installation, Operation and Parts Manual EE-C18E INSTALLATION INSTRUCTIONS  4.1 Preparations before installation  4.1.1 Space requirements.    Refer to 3.4 for the dimensions of the lift. There must also be a clearance of at least 1 meter between the lifting platform and fixed  elements (e.g. wall) in all lifting positions. There must be sufficient space for driving vehicles on and off.    4.1.2 Foundations and connections    The user must have the following work performed before erecting the lift.    Construction of the foundation following consultation with the manufacturer’s customer service or an authorized service agent. Routing of  the wiring to the installation location. The user must provide fuse protection for the connection. Electrical system connection must be  2  done by licensed technicians. Requirements for power supply cable of the installation site: at least 2.5mm wire core for 3Ph power and  2  4.0mm wire core for 1Ph power.  Refer also to the corresponding information on the name plate and in the operation instructions.  Before doing electrical connection, make sure the lift is electrically adapt to the local power supply.    4.1.3 Foundations preparations  Refer to Annex 1 for footing.    C25/30 concrete base with strength more than 3000psi, Minimum thickness of 400mm (continuous footing).    Surface: Horizontal and even (Gradients max. 0.5 %)  Newly built concrete ground must be older than 20days.  4.1.4 Tools and equipment needed for installation    Tool name  Specification  Quantity   ...
  • Page 13: General Installation Steps

    Installation, Operation and Parts Manual EE-C18E 4.3 General installation steps    ONLY TRAINED AND QUALIFIED INSTALLERS CAN PERFORM LIFT INSTALLATION DUTIES.    Step 1: Remove the packaging and take out the accessories attached.    : Attention The packs must be opened adopting all the precautions required to avoid injury to persons (keep at a safe distance when cutting  the straps) or damage to parts of the machine (be careful that no parts are dropped while you are opening the packing).  Use proper means (put something supporting under the post or suspend the post by a crane)to suspend the post, unsrew and remove  the bolts fixed on the iron rack.    1.Hex bolt        2.Iron rack      : Attention Please pay special attention not to let the post fall down for it may cause casualty or bring damages to the accessories fixed in the  post.    Step 2: Fix the standing position for the two posts. (see Annex 1, floor plan)    1. Decide on which post the power unit is going to be mounted.  2. Draw an outline of the base plate on the installation ground with chalk and ascertain the position for the two posts.  Step 3: Connect extending posts.        1.Hex nut M14       ...
  • Page 14 Installation, Operation and Parts Manual EE-C18E Step 4: Erect and secure the post.  1.Make  the  posts  face  to  each  other  and  the  distance  between  the  posts  equals  to  the  length  of  the  overhead  crossbeam.  Use  proper  means to eret the post.    2. Check the position of the base plates again.  3. Drill the mounting holes. Remove the drilling dust from the hole.  4. Use a spirit level to check the vertical alignment of the posts. If necessary, place equalizing plates under the base plates.The equalizing  plates must be of the same length as the side of the base plate resting on them. Otherwise the load of the base plate will not be transferred  evenly to the foundation.    5. Erect and secure the other post similarly.   ...
  • Page 15 Installation, Operation and Parts Manual EE-C18E Step 6: Connect the synchronization steel cable.  1. Route and fix according to the following scheme  2. Before attempting to route the cables, raise the lifting carriage at both sides to the first latching position making sure that the mechanical  safety locking units in each post are fully engaged.  3. After fixed the cables, adjust and make the cables at both sides be with the same tightness which could be judged by the sound emitted  during lifting process.    4. Grease the cable after being fixed. (It is a must.)    1. Steel rope A    2. Steel rope B      Step 7: Connect the hydraulic system.  1.Install hydraulic power unit onto the power side post.    1. Hex nut M10  2. Flat washer M10        3. Spring washer M10            4. Anti‐virbration pad             ...
  • Page 16 Installation, Operation and Parts Manual EE-C18E 2. Connect oil hoses to the “T” connector in the power side post.    NOTE: make sure the connectors and hoses are clean.                              1. Oil hose 1      2. Oil hose2        3. Power unit              4. Oil hose 3    5. Oil cylinder           ...
  • Page 17 Installation, Operation and Parts Manual EE-C18E 2.Fix max height limit switch onto the inside surface of the main post and connect its wire to the terminals reserved in the post.                                1. Limit switch      2. Hex socket screw M4*25   3. Wire      3.Connect the wires of electromagnets. Remove the cover beore making the connection.      Step 9: Install lifting arms.  The arm pin shafts (No. 2) must be greased at the installation.      Install the lifting arms onto the carriages and ensure the arm lock could work.  Attention: Install Lifting arms and fix feet protection bars ONLY after the complete assembly has been erected and anchored. ...
  • Page 18 Installation, Operation and Parts Manual EE-C18E 1. Lifting arm    2. Arm pin shaft  3. Feet protection fender    4. Hex socket cap head screw M8*12    Step 10: Fill with hydraulic oil.  ONLY CLEAN AND FRESH OIL ONLY    Lift must be fully lowered before changing or adding hydraulic oil .  Prepare 14 liters of hydraulic oil. Fill about 12 liters into the oil tank to run the lift up and down for 2 or 3times after the electrical system is  connected and then fill into the rest 2 liters.  Note:It is suggested to use NO.46 hydraulic oil when average temperature of the location is above 18 degree Celsius and using NO.32  hydraulic oil when temperature is below 18 degree Celsius.    Change the oil 6 months after initial use and change once per year thereafter.    Step 12: Trial running.  Get  familiar  with  lift  controls  by  running  the  lift  through  a  few  cycles  before  loading  vehicle  on  lift.  This  step  is  of  particular ...
  • Page 19: Items To Be Checked After Installation

    Installation, Operation and Parts Manual EE-C18E 4.4 Items to be checked after installation  S/N  Check items  YES  NO  1  Screw torque of expansion bolts : 110 N•m;  √    2  Rising speed ≥20mm/s;  √    3  Noise with rated load ≤75db;  √    4  Grounding resistance: not bigger than 4Ω;  √    5  Height difference of the two carriages ≤5mm;  √        6  Mechanical catch unit is robust and synchronized when running with rated load ;  √    7  If the control button works as “hold to run”?   ...
  • Page 20: Operation Instructions

    Installation, Operation and Parts Manual EE-C18E 5.2 Operation instructions    POS.  Name    Function    QS  Main power switch    Control on or off of the main power.    HL  Power indicator    Indicate power connection.    SB1  UP button    Control ascent movement.    SB2  DOWN button    Control descent movement.  SB3  APS button    Woke with SB2 for direct descent.    SB4  LOCK button   ...
  • Page 21: Trouble Shooting

    Installation, Operation and Parts Manual EE-C18E TROUBLE SHOOTING  ATTENTION:  If  the  trouble  could  not  be  fixed  by  yourself,  please  do  not  hesitate  to  contact  us  for  help.  We  will  offer  our  service  at  the  earliest time we can. Troubles could be judged and solved much faster when more details or pictures could be provided.      TROUBLES  CAUSES  SOLUTIONS  Abrasion exists on insider surface of the posts. ...
  • Page 22: Inspection And Maintenance

    Installation, Operation and Parts Manual EE-C18E INSPECTION AND MAINTENANCE  Easy and low cost routine inspection and maintenance can ensure the lift work normally and safely.        Follow the below routine inspection and maintenance schedule with reference to the actual working condition and frequency of your lift.     S/N  Components    Methods  Period    Push the UP button to raise the lifting arms and check if four  1  Swing arm locking units    Every day  swing arms are locked into position. Add grease in case necessary.    Inspect the pads and clean off any objects that may cause sliding  2  Rubber contact pads    Every day  or damage.  Cylinder and oil hose  3  Inspect to ensure no leakage before using the lift.      Every day  connectors     ...
  • Page 23 Installation, Operation and Parts Manual EE-C18E S/N  Components    Methods  Period    Push the UP button and inspect and to ensure the lifting platform  6  Limit switch    Every day  stops rising when the switch is activated.    Inspect if the valve leaks or not. Clean or change the valve if it  7  Unloading valve    Every day  leaks.    Check the synchronization of both carriages and adjust the  8  Steel cables      Every day  tightness of the cable if desynchronization is unacceptable.      Bushing of the upside pulley  Lubricate the bushing with NO.1 lithium based grease.  9  Every 3 months and circlip of the shaft   ...
  • Page 24: Annex 1, Floor Plan

    Installation, Operation and Parts Manual EE-C18E Annex 1, Floor plan  Indoor installation only. There must also be a clearance of at least 1 meter between the lifting platform and fixed elements (e.g. wall) in all  lifting positions. There must be sufficient space for driving vehicles on and off.    C25/30 concrete base with strength more than 3000psi, Minimum thickness of 400mm. Surface: Horizontal and even (Gradients max. 0.5 %)  Newly built concrete ground must be older than 20days.  In mm.                                     ...
  • Page 25: Annex 2, Electrical Schemes And Parts List

    Installation, Operation and Parts Manual EE-C18E Annex 2, Electrical schemes and parts list             ...
  • Page 26 Installation, Operation and Parts Manual EE-C18E...
  • Page 27 Installation, Operation and Parts Manual EE-C18E...
  • Page 28 Installation, Operation and Parts Manual EE-C18E POS.  CODE  Name    Specification    Qty    SQ2  320301011  Limit switch    TZ8108  1    SQ1  320301002  Limit switch  CZ7120  1    YA1 YA2  410044350B  Electromagnet    6254E.V3‐A14  2    T  320102005  Transformer    BK‐100VA 400V230V‐24V  1   ...
  • Page 29: Annex 3, Hydraulic Schemes And Parts List

    Installation, Operation and Parts Manual EE-C18E Annex 3, Hydraulic schemes and parts list                      1.oil tank      2.oil sucking filter    3.gear pump      4.coupling        5.motor    6.hydraulic block      7.cushion valve    8.overflow valve      9.single way valve ...
  • Page 30 Installation, Operation and Parts Manual EE-C18E POS.  Code  Name  Specification  Qty  1  330405030  Oil tank    12L  1  2  330101005  Composite hydraulic block    YF‐2D  1  3  330308006  Solenoid unloading valve    DHF06‐220H/DC24  1  4  330304001  Overflow valve    EYF‐C  1  5  330302001  Single valve    DYF‐C ...
  • Page 31 Installation, Operation and Parts Manual EE-C18E POS.  Code  Name  Specification  Qty  14  330403002  Oil back tube    YG‐B  1  15  330402001  Oil return tube    YH‐D  1  16  410010091  Reinforced plate    6254E‐A4‐B12  4  17  20102002  Hex head full swivel screw    M5*10  4  18  320203005  Motor    400V/3.5KW ‐3PH‐50HZ‐2P ...
  • Page 32: Annex 4, Mechanical Exploded Drawings And Parts List

    Installation, Operation and Parts Manual EE-C18E Annex 4, Mechanical exploded drawings and parts list  POS.  CODE  Name    Specification    Qty  1  202111007  Hex socket flat head screw    M8*20  8  2  420130010  Round lifting pad    6214EKZ‐A4‐B4‐C4  4  3  615035022  Liting tray    6214EKZ‐A4‐B4  4  4  614058009  Third ‐stage arm    C18‐A4‐B3  4  5  201102016 ...
  • Page 33 Installation, Operation and Parts Manual EE-C18E POS.  CODE  Name    Specification    Qty  17  614058003  Carriage    C18‐A3‐B1  2  18  410580001  Slider    C18‐A3‐B3  16  19  420130040B  Protective rubber pad    6255E‐A3‐B3  2  20  202103021  Hex socket flat head screw M8*16  M8*16  4  21  615058004  Pulling rod   ...
  • Page 34 Installation, Operation and Parts Manual EE-C18E POS.  CODE  Name    Specification    Qty  25  206102008  Elastic post pin M5*50  M5*50  4  26  410540380  Sheath of pulling rod    C12‐A3‐B4  4  27  204301008  Circlip    M22  4  POS.  CODE  Name    Specification    Qty  28  320301002  Limit switch   ...
  • Page 35 Installation, Operation and Parts Manual EE-C18E POS.  CODE  Name    Specification    Qty  40  202109024  Hex socket cylinder head screw    M6*35    41  614058005  Outside beam    C18‐A21‐B1  1  42  203101008  Hex nut    M14  42  43  204101008  Flat washer    M14  42  44  201102035  Hex head full swivel screw   ...
  • Page 36 Installation, Operation and Parts Manual EE-C18E POS.  CODE  Name    Specification    Qty  46  203101008  Hex nut    M14  4  47  201102037  Hex head full swivel screw    M14*40  20  48  204201007  Spring washer    M14  20  49  204101008  Flat washer    M14  20  50  201103004  Hex head full swivel screw   ...
  • Page 37 Installation, Operation and Parts Manual EE-C18E POS.  CODE  Name    Specification    Qty  46  203101008  Hex nut    M14  4   47  201102037  Hex head full swivel screw    M14*40  20  48  204201007  Spring washer    M14  20  49  204101008  Flat washer    M14  20 ...
  • Page 38 Installation, Operation and Parts Manual EE-C18E POS.  CODE  Name    Specification    Qty  50  201103004  Hex head full swivel screw    M10*35  4  51  420040010  Anti‐shock pad    6254E‐A23  4  52  204201005  Spring washer M10  M10  4  53  204101006  Flat washer M10  M10  4  54  203101006  Hex nut    M10 ...
  • Page 39 Installation, Operation and Parts Manual EE-C18E POS.  CODE  Name    Specification    Qty  81  Oil hose    L=11100mm  1  82  615006003  Three way connector    6214E‐A4‐B4(6214A‐A5‐B2)  1  83  Power unit    3.5KW  1  84    Oil hose    L=400mm  1  85    Oil hose    L=2500mm ...
  • Page 40 Installation, Operation and Parts Manual EE-C18E POS.  CODE  Name    Specification    Qty  89  202111004  Hex socket button head screw    M8*12  8  90  614004014B  Long arm fender    6254E‐A7‐B5  4  91  612013002  Heigth adapter    6214EKZ‐A4‐B5  4  POS.  CODE  Name    Specification    Qty  33  202111004 ...

Table of Contents