Assembling Instructions; Assembling The Handle Bar; Mounting And Emptying The Collection Bag; Operation - FLORABEST FLV 1200 A1 Translation Of Original Operation Manual

Electric scarifier / aerator
Table of Contents

Advertisement

Available languages

Available languages

GB
ed cord diameter of the extension ca-
ble must be at least 2.5 mm
unreel a cable drum to its full length so
that the entire cable can be checked
for damage.
Use the envisaged cable suspension
when attaching an extension cable.
Never pull the cable to disconnect the
plug from the socket. Protect the cable
from heat, oil and sharp edges.
If the connecting cable is damaged,
first disconnect the extension cable
from the socket. You can then discon-
nect the connecting cable of the equip-
ment.
If the power cable for this equipment is
damaged, it must be replaced by the
manufacturer, a customer service agent
of the same or a similarly qualified per-
son in order to prevent hazards.
Assembling
instructions
Prior to any work on the implement
always disconnect the plug from the
power socket!

Assembling the handle bar

B
1. Insert the lower bar (7) into the
implement case (8) and screw
it on with the two Philips screws
(22).
2. Screw both central bars (15)
with the screws and the wing
nuts (4b) to the lower bar (7).
3. Hang the cable strain relief (18)
on the upper handle bar (3).
4. Screw the upper bar (3) with the
screws and the wing nuts (4a) to
both central bars (15).
5. Fasten the machine cable (19)
with the machine cable terminals
(12/16) to the bar.
38
Mounting and emptying the
collection bag
. Always
2
Assembling the collection bag:
The collection bag is delivered in a folded
state and must therefore be assembled be-
fore it is mounted on the implement.
C

Operation

WARNING: Never operate
the implement without the
impact protector. Danger of
Injury!
1. Assemble the collection bag rods
(23).
2. Pull the collection bag over the
rods.
3. Put the plastic straps of the col-
lection bag over the collection
bag rods and clip into the plastic
straps.
Mounting the collection
bag on the implement:
4. Lift the impact protector (6).
5. Push the pins on the collection
bag rods into the socket in the
implement case.
6. Release the impact protector so
that it holds the collection bag
(6) in its position.
Removing and emptying
the collection bag:
7. Lift the impact protector (6) and
take out the collection bag (5).
Please observe local regulations
concerning noise protection. It is
quite possible that local rules and
regulations may limit the time of
implement operation or even pro-
hibited its use on certain days (e.g.
Sundays and holidays), and dur-
ing certain times of the day (noon,
night hours) and in certain areas
(e.g. spars, clinics, etc.).

Advertisement

Table of Contents
loading

This manual is also suitable for:

93500

Table of Contents