Check And Confirmation; Description Of On/Off And Status - BYD Energy Pod Series User's Installation And Use Manual

Table of Contents

Advertisement

5 Check and Confirmation

Prior to officially using the product, please check each item listed in the table one by
one according to the Check and Conformation Form given below, including product
fixation, electrical connection, etc.
Items
Base fixing bolts
Fixation of wall hanging accessory on wall surface
Connection of fixing bolts among parts
Connection of grounding wire
Grid cable specification
Phase of Grid interface
Load cable specification
Phase of Load interface
CT cable specification
Grid-CT position
Grid-CT direction
PV-CT position
PV-CT direction
LAN cable specification
Base fuse
Base fuse cover plate
6

Description of on/off and Status

Please make sure that the product is fixed firmly and all cables are connected
correctly before activating the product.
Closing of BMS circuit breaker:
Open the BA Switch cover and close the circuit breaker
Start-up: Close the grid circuit breaker and press the POWER button on the
BMS for a long time, until the button indicator lights up (about 5S).
Shutdown: Press the button on PCS for a long time until the button indicator
lights off (about 5s), and disconnect the BA Switch and the grid circuit breaker.
Check and Confirmation Form
Confirmation
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Secret
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents