4.3 Installation of wall hanging accessory 2 and BASE
Take off the nuts and washers of the expansion bolts in 4.2, install the wall hanging
accessories and base at the corresponding positions, and tighten the nuts with a
torque of 45N.m. The limiting stopper is designed at the rear of the base.
4.4 Installation of modules
The Battery, BMS and PCS are installed in sequence, and are fixed with each other
by use of bolts.
Installation of Battery:
Install as per the actual number of Battery, the following figure shows an example with
5 Batteries. Tighten the bolts with a wrench for each moudule.
Installation of wall hanging accessory 1
Install the wall hanging accessory 1 on the back of the BMS as shown in the following
figure.