BYD Energy Pod Series User's Installation And Use Manual page 29

Table of Contents

Advertisement

Secret
PV-CT
The installation position and direction of CT at the end of the PV are shown as
follows.
Insert the CT correctly connected to the PV into the corresponding CT-PV interface of
the PCS.
Note: The length of network cable accompanied with the CT is 3m. If the cable
is not long enough, the user need to prepare the network cable with sufficient
length and use the network cable connectors to connect the CT with the CT
interface on PCS.
27