Viavi mA-3A01 Operation Manual page 31

Axie mass storage module
Table of Contents

Advertisement

Chapter 3 Operation and Configuration
Module Configuration Application
Procedure Steps
1
Power on the CMP System.
2
Open the Storage Module Configuration application.
3
A window will be displayed that resembles Figure 3-5.
Figure 3-5
4
Verify the Tag / Details show the following status:
Figure 3-6
5
Depending on requirements, select either the Reconfigure button or Sanitize button
(located on the right side of the window).
Page 3-8
Storage Module Configuration Application Window
Main: Ready
Main: Found Storage Module
Storage Module Configuration Application Window
mA-3A01 AXIe Mass Storage Module Operation Guide
Rev. B0
April 2020

Advertisement

Table of Contents
loading

Table of Contents