Other CRUs
You must remove power from the library when working on the following CRUs:
Robot
■
Module Controller
■
Front Control Panel
■
Base and Expansion Module Chassis
■
In addition, you must remove tape cartridge magazines to replace the Front Control
Panel, Base Module, and Expansion Module CRUs.
Preparation Procedures
This section provides procedures to remove library power and manually remove a
cartridge magazine to gain access to the screws securing the module to the rack.
Power-Down
There are two methods of removing power from the library: controlled and forced.
Perform the controlled power down using either the Front Control Panel power
■
button or the SL150 remote interface power icon.
Perform the forced shutdown method at the library or rack power source.
■
To Perform a Controlled Power-Down from the GUI
Quiesce the host application to prevent disruption of active storage operations.
1.
Log in to the SL150 remote interface using your browser (see
2.
Click the power icon in the upper left of the screen (see
3.
Select Power Down Library.
4.
Select Prepare the Robot for removal before the library powers down, if
5.
applicable (see
Click OK.
6.
Follow the on-screen prompts (for example, instructions to lock the robot).
7.
Continue with
"Power System Behavior"
Note:
power supply indicator is not active.
The robot, front control panel, and base module chassis are
Caution:
critical to maintaining the product serial number and customer
settings. When a replacement is needed for any of these CRUs, you
may only replace one CRU during a single power down cycle.
Use the forced power-down method only when the
Note:
controlled method does not work (see
Power-Down"
on page 3-13).
Figure
3–12).
on page 3-35 if the
"To Perform a Forced
Figure
Figure
3–11).
Removal and Replacement 3-11
Other CRUs
2–1).