Shipping and Handling

Inspection

Examine the shipment for external evidence of damage as
soon after receipt as possible, preferably before removal
from the carrier's conveyance. Check the bill of lading to
make sure all listed shipping skids, crates, and containers
are present. If there is visible loss or damage:
1. Notify the delivering carrier immediately.
2. Ask for a carrier inspection.
3. Note the condition of shipment on all copies of the
delivery receipt.
4. File a claim with the carrier.
If concealed damage is discovered:
1. Notify the delivering carrier within 15 days of receipt of
shipment.
2. Ask for a carrier inspection.
3. File a claim with the carrier.
Also, notify S&C Electric Company in all instances of
loss or damage.
6
S&C Instruction Sheet 1025-510

Packing

A complete GridMaster Microgrid Control System consists
of the following components:
• The GridMaster controller
• This Instruction Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GridMaster and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents