Check, Test, And Start Procedure Form - McQuay SWP Series Installation And Maintenance Manual

Self-contained air conditioning system, vintage sizes 018 through 105, microtech iii unit controller
Table of Contents

Advertisement

Check, Test, and Start Procedure Form

Check, Test, and Start Procedure for SWP/SWT (Self-Contained Air Conditioning Systems)
Job name: ________________________________________________ McQuay G.O. #: _______________________
Installation address: ______________________________________________________________________________
City: _____________________________________________________ State: _______________________________
Purchasing contractor: ___________________________________________________________________________
City: _____________________________________________________ State: _______________________________
Unit model number: ________________________________________ Serial number: ________________________
Compressor #1 serial number: _____________________ Compressor #2 serial number:________________________
Compressor #3 serial number: _____________________ Compressor #4 serial number:________________________
Compressor #5 serial number: _____________________ Compressor #6 serial number:________________________
Mark NA on all items that do not apply to the type of the unit. See the IM bulletin for more information. Make any additional
comments on a separate sheet of paper and attach to this form.
Initial check
1
Is any shipping damage visible? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
2
Is the unit installed level? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes .
3
Is the unit positioned to provide adequate free area for service and operation?. . . . . . . . . . . . . . . . . . . . . . Yes
4
Are the fan drives properly aligned and belts adjusted? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
5
Does the fan turn freely? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
6
Are all setscrews on pulleys, bearings, and fans tightened?. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
7
Are the condenser water temperature sensors located correctly? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
8
Has the installing contractor installed the return air temperature sensor in the return air stream? . . . . . . . . Yes
9
Has the installing contractor installed the high and low static pressure sensor tubing in the ductwork?. . . . Yes
10
Does electrical service correspond to the unit nameplate? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
11
Are adequate disconnect and circuit protectors installed? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
12
Is the unit adequately grounded? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
13
Are all electrical power connections tight? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
14
Have the compressor heaters operated continuously for 24 hours prior to startup?. . . . . . . . . . . . . . . . . . . Yes
15
Does all electrical wiring conform to unit electrical diagram? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
16
Does all field wiring conform to electrical diagrams?. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
17
Are all service valves open? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes
18
Have all shipping hold-down plates securing the fan frame been removed? . . . . . . . . . . . . . . . . . . . . . . . . Yes
19
On unit with ducted return, has the low side tubing for PC5 (dirty filter switch) been installed? . . . . . . . . . . Yes
20
Are all the cleanout plugs installed (condenser, condensate trap, and optional waterside economizer)?. . . Yes
McQuay IM 937
Compressorized Equipment Warranty Registration Form:
return to McQuay, Warranty Department, within 10 days to comply with the terms of McQuay
Warranty.
Check, Test, and Start Procedure Form
Complete this form and
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
No
51