Veeder-Root Red Jacket Quick-Set Installation, Operation And Service page 66

4” submersible turbine pump 380 - 415 v, 3 phase, 50 hz
Hide thumbs Also See for Red Jacket Quick-Set:
Table of Contents

Advertisement

Appendix A
Air Purge Screw Operation
Air Purge Screw Operation
The air purge screw is used to rid air from the line and manifold hydraulic cavities after opening a port in the
manifold (e.g., after installing a line leak detector). When repairs to the pump have been made, the technician will
need to purge the air within the manifold as shown in diagram 1 of Figure A-6. The air purge screw is rotated 2-3
turns counterclockwise, then the pump is turned on.
CAUTION! The air purge screw is retained by the hitch pin to limit travel. Do not attempt to rotate beyond 3 turns.
As the pump runs, any air in the cavities is pushed through the small tank return port as shown in diagram 2. After
the pump has run for about 2 -3 minutes the air will have been removed from the manifold and piping as shown in
diagram 3. While the pump is still running, turn the air purge screw clockwise until it is completely closed. Open
the ball valve down line from the pump.
1
2
3
Pump on
Pump on 2-3 min.
AIR
To tank
To tank
AIR
Figure A-6. Purging air from manifold
A-4

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Red Jacket Quick-Set and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF