Veeder-Root Red Jacket Quick-Set Installation, Operation And Service page 48

4” submersible turbine pump 380 - 415 v, 3 phase, 50 hz
Table of Contents

Advertisement

Service And Repair
Place a mark on the facing
of the packer using a felt
pen to indicate the position
of the index hole
Hole to receive male
connector's indexing pin
12. Place a small piece of masking tape on the pins side of the connector inline with the indexing pin (see
Figure 35).
13. Lubricate the O-ring on the male connector with petroleum jelly.
Figure 35. Placing Masking Tape Alignment Marker On Front Of Male Connector
14. Thread the wires of the new male connector down into the socket and out through the opening in the base of
the socket into the packer wiring compartment. Gently pull the wires into the wiring compartment as you align
the masking tape mark on the connector with the felt tip mark on the packer facing. When you have pushed
the connector all the way into its socket it should not rotate if the indexing pin is in the index hole. Using the
small ruler, measure the distance from the packer facing down to the connector, it should be a little more than
1-3/8'' (35mm) (see Figure 36). Hold the wires tight to keep the connector in position and insert the retaining
washer (with upturned teeth facing out) forcing it down until it is firmly against the connector. Recheck the 1-
3/8'' (35mm) measurement after installing the retaining washer to confirm that the connector is at the proper
depth.
Figure 34. Male Connector Index Hole In Base Of Socket
Indexing pin
O-ring
Place small strip
of masking tape
on this surface
inline with the
indexing pin
42
Replacing the Packer-to-Manifold Wiring Connectors
rjpumps/fig44.eps
045-2

Advertisement

Table of Contents
loading

Table of Contents