Installation

Installing Two Pumps for Tandem Operation

When greater flow rates are needed, two pumps may be installed in the same piping system by means of a
manifold. If installed according to the Figure 17, tandem systems offer backup support so operations can continue
if one pump stops working.
WARNING
Proper check valves with pressure relief are required to be installed in the discharge
line of each pump to prevent product from being pumped through the pressure relief
system of the adjacent pump when it is not operating.
NOTICE
Ball valves should be installed at the pump end of the discharge line for ease of mainte-
nance and troubleshooting (see Figure 17).

Figure 16. Equipotential Bonding Terminal

Ball valves

Figure 17. Tandem Pumps

22
Installing Two Pumps for Tandem Operation
External equipotential
bonding terminal

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Red Jacket Quick-Set and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF