Connecting To The External Equipotential Bonding Terminal; Figure 15. Three Phase Pump Wiring Diagram Examples - Veeder-Root Red Jacket Quick-Set Installation, Operation And Service

4” submersible turbine pump 380 - 415 v, 3 phase, 50 hz
Hide thumbs Also See for Red Jacket Quick-Set:
Table of Contents

Advertisement

Installation
The ATG terminal will be the
same voltage and phase as
the power supplied to the L1
terminal.
TB1
240 V
Isotrol
ATG
3
2
Orange
LEGEND
Bi-Metallic
Normally
Normally
switch
closed
open
terminal
contact
contact

Connecting to the External Equipotential Bonding Terminal

A M6 threaded fastener set is provided on the side of the manifold underneath the double siphon port facility (see
Figure 16). Connection is to be in accordance with nationally applicable installation regulations using a conductor
having a cross-sectional area of at least 4mm
240 V Coil
A
To 380-415V Supply
N
L1
L2
L3
L1
L2
L3
Manual Motor
Protector
See Appendix C
L2
L1
L3
Contactor
For Remote
Control
COIL
NOTE: Contactor is
wired for 380-415V
to pump motor,
240V from Isotrol or
Black
Red
dispenser switch.
To STP
Screw
Wire added
Wire added
by installer
by manufacturer

Figure 15. Three Phase Pump Wiring Diagram Examples

2
(10 AWG).
Connecting to the External Equipotential Bonding Terminal
240 V Coil
To 380-415V Supply
N
Dispenser
L1
3
2
Orange
Junction box
in manifold
Make ground connection
G
in accordance with local
codes.
On-winding
overload
protectors
STP
B
L1
L2
L3
L1
L2
L3
Manual Motor
Protector
See Appendix C
L3
L2
Contactor
For Remote
Control
COIL
NOTE: Contactor is
wired for 380-415V
to pump motor,
240V to dispenser
Black
Red
switch.
To STP
Electrical
interlock
Extractable
R
packer
O
Motor
21

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Red Jacket Quick-Set and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF