Veeder-Root Red Jacket Quick-Set Installation, Operation And Service page 41

4” submersible turbine pump 380 - 415 v, 3 phase, 50 hz
Table of Contents

Advertisement

Service And Repair
7. Replace the protective plug over the service screw and fully thread into place to ensure a good seal.
8. Open the air purge screw 2 - 3 turns counterclockwise (see Figure 26).
WARNING
The air purge screw is retained by a hitch pin to limit travel. Do not attempt to rotate
beyond 3 turns.
9. Turn the pump on and let it run for about 2 minutes to purge air from the manifold's hydraulic cavities. While
the pump is still running, turn the air purge screw clockwise until it is completely closed.
10. If applicable, open the ball valve down line from the pump.
rjpumps/fig39.eps
Figure 30. Inserting Check Valve Assembly Into Manifold
35
Replacing the Check Valve Assembly
Check valve housing o-ring
(-231 [2.609'' ID x 0.139'' wide])
Service screw o-ring
(-114 [0.612'' ID x 0.103'' wide])
Lock down seal o-ring
(-114 [0.612'' ID x 0.103'' wide])
Check valve main seal o-ring
(-225 [1.859'' ID x 0.139'' wide])

Advertisement

Table of Contents
loading

Table of Contents