Veeder-Root Red Jacket Quick-Set Installation, Operation And Service page 12

4” submersible turbine pump 380 - 415 v, 3 phase, 50 hz
Table of Contents

Advertisement

Introduction
• ATEX Directive 2014/34/EU approved Red Jacket Submersible Turbine Pump Assemblies shall be marked with the
following information:
Manufacturer:
Veeder-Root Company
2709 Route 764
Duncansville, PA 16635 U.S.A.
Marking:
Type series
Serial Number
Year of Construction
e
c
II 1/2 G
XXXX
EN15268 II A T3
DEMKO 12 ATEX 1247797 X
CAUTION-KEEP COVERS TIGHT WHILE CIRCUITS ARE ALIVE
Instructions:
• All submersible pumping units (UMPs), manifolds and associated equipment shall be installed in accordance with the
manufacturer's installation, operation and service manuals supplied.
• All installations shall provide reliable electrical connection between the submersible turbine pumps, frame, piping, manifold
or junction box and the tank structure for the electrical protection and equipotential bonding.
• Connection of the motor wiring inside the packer shall be with the supplied T & B butt splice pressure wire connectors and
sealed within the 3M Scotchcast epoxy sealant bag.
• Fasteners securing the discharge head shall be replaced only by fasteners provided in kit 144-327-4 and kit 410818-001 for
models with the AG prefix.
• The nut securing the packer and manifold assembly is steel with a minimum yield strength of 450 N/mm2.
• The male connector is the partition wall between EPL Ga and Gb. It consists of a plug made from a phenolic material,
designation 23570 manufactured by Durez, with a Flammability rating of V-0. It is also filled with a two part epoxy,
designation 7136A/B manufactured by Epic Resins.
• The dimensions of the flameproof joints are detailed in drawing no. 410626-001.
• When the submersible pumping unit (UMP) is installed in areas where Category 1 equipment is required, the use of a Motor-
Protective Circuit-Breaker (Manual Motor Protector) with phase failure protection as described in the installation instruction
manual is necessary to meet Category 1 requirements.
• Compliance with the Essential Health and Safety Requirements has been assured by compliance with: EN ISO 80079-
36:2016, EN 13463-3:2005, EN ISO 80079-37:2016, EN 15268:2008, EN 60079-0:2012, EN 60079-1:2014, EN 60079-
7:2015, EN 60079-18:2015, EN 60079-26:2015
SPECIAL APPLICATION CONDITIONS
"X" sign which follows the explosion-proof mark means, that the following "special" conditions should be
observed when operating the electric pumps:
1.
All pump models, packer/manifold and related equipment shall be installed according to installation manuals.
2.
During electric pump installation all electric connections between the electric pump, frame, pipeline, manifold and tank
shall be securely connected in order to provide electric protection and bonding.
3.
Spark-proof Tools shall be used for electric pump installation and maintenance.
4.
Repairing and adjusting of the electric motor is not allowed. Only change it completely assembled with appropriate motor
from the Manufacturer.
4" The Red Jacket STP Safety Instructions
– SPECIAL CONDITIONS FOR SAFE USE (EN 15268 Compliant)
Custom Union
Certificate of Conformity
#CU RU C-US.AA87.B.01125
Series RU # 0743759
Explosion-proof mark: II Ga/Gb b c d IIA T3 X
6
Warnings and Instructions

Advertisement

Table of Contents
loading

Table of Contents