Renishaw HS20 Installation Manual page 49

Table of Contents

Advertisement

Section 5 - System Integration
Contained in this section
System integration
Reset input signal
Operation of system on power-up
HS20 diagnostic LEDs
Pre-HS20 feedback testing
Laser power fail test
Laser unstable test
Beam low test
Beam block test
Overspeed test
Quadrature check (direction and resolution)
Switching machine control to HS20 feedback
Machine under HS20 feedback testing
Objectives
Status line verification
HS20 reset from machine control
Machine home operation
Home cycle simulation
Automated home cycle
45

Advertisement

Table of Contents
loading

Table of Contents