Installation; Mechanical Connection; Suspension Lug; Adjustments - probst FTZ-I Operating Instructions Manual

Grab for prefabricated concrete products
Table of Contents

Advertisement

Available languages

Available languages

Installation

4 Installation
4.1

Mechanical connection

4.1.1

Suspension lug

The device is equipped with a suspension lug and can be mounted on various carrier/lifting equipment.
Take care that the suspension lug is safely joined with the crane hook and cannot slide down.
The maximum carrying capacity/working load limit (WLL) of the carrier/lifting equipment is not allowed to
exceed by the dead weight of the device and the maximum load.

5 Adjustments

5.1

Adjustment of the gripping range

Before the product can be lifted and transported, the gripping range has to be adjusted to the dimensions of the
product.
The adjustment of the gripping range may never take place on both sides at the same time.
Always adjust the gripping range first to the one and then on the other side.
Pull the spring bolt upwards, rotate around 180° and lock in position (in nick).
Move the rectangular tube, until the gripping range is approx. 5 cm larger than the product.
Pull the spring bolt back up again and rotate around 180°.
Move the rectangular tube so long until the spring bolt engages in one of the holes.
The adjustment of the gripping range has to follow general symmetrical.
That means, it must be used in each case the same adjustable hole with both rectangular tubes.
Caution while adjusting of the gripping range.
There is a danger of injuring the hands!
Top view from down
Spring bolt
Rectangle tube