schmersal PSC1 Installation Manual page 94

Field buses
Hide thumbs Also See for PSC1:
Table of Contents

Advertisement

Installation manual
The functional inputs and outputs must still be inserted in the "Functional scheme" and
logically connected.
The project and the network configuration must be transferred:
"Click the "Device Interface" icon
Installation manual PSC1-Field buses V2.2.docx
Page 94 of 166

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Psc1-c-100-fb1Psc1-c-100-fb2

Table of Contents