Acorn 80 Installation Manual page 52

Hide thumbs Also See for 80:
Table of Contents

Advertisement

APPENDIX 10
Rationalisation Procedures
15 Check the motor is correctly working on the carriage and that the seat fully clears the carriage at all points.
RE-ASSEMBLE THE CARRIAGE FRONT COVER TO THE MAINFRAME, ENSURING THAT NO
CABLES ARE TRAPPED IN THE COVERS
10.4 Connecting Supercharger Link
IN ORDER FOR THE SUPERCHARGER LINK WIRE TO WORK, THE MAIN PCB MUST ALSO HAVE
A LINK WIRE ON THE BACK OF THE BOARD AS SHOWN BELOW
LINK WIRE ON THE
BACK OF THE BOARD
52
ACORN 80 Installation Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents