If necessary move the lift back along the rail using the winding handle.
2
Fit the top & bottom charge points to the rail as shown on the installation drawing. Connect the charge
points to the battery charger.
3
Test all charge points with a voltmeter (32v DC).
4
Fit the top & bottom limit switch striker plates onto the back of the charge points.
5
Fit the top & bottom mechanical stops to the rail rack.
6
Fit the end cap to the final section of rail.
ACORN 80 Installation Manual
FITTING RAIL EQUIPMENT
THE NEXT STEP IS AN IMPORTANT SAFETY REQUIREMENT.
SECTION 7
Fitting Rail Equipment