Checking The Program - Acorn 80 Installation Manual

Hide thumbs Also See for 80:
Table of Contents

Advertisement

SECTION 8
Programming
8.1.7 Intermediate/Park Charge Point
This charge point is used if the lift is required to be parked above the bottom of the rail or on a landing. This is
also required on rail systems with hinges.
When the red park button command is used on the remote control, the lift will travel up to the next charge point
and stop on charge detect. This is repeatable if more than one intermediate charge point is required. The lift will
only stop on an intermediate charge point with the park button on the remote control.
8.1.8 Intermediate/Landing Charge Point
This charge point is used on internal systems where the lift is required to stop on a landing, which has corridor or
room access.
During programming of the rail, program CREEP SPEED 100mm (If programming in full speed) before and after
the charge point. Reduce this to 50mm before and after the charge point (If programming in bend speed).
Deselecting both FULL and BEND SPEED selects creep speed (default).
With this option the lift will always stop on the charge point with charge detect in either direction, using either the
rocker switch or the remotes. To move the lift on if not required to stop, release the call and reapply.

8.1.9 Checking The Program

With the lift just above the bottom charge point drive it down and check that the terminal limit is in the correct
position. Adjust and reprogram if necessary. Drive the lift up the rail checking that the speeds and levelling are
satisfactory. Check that the speed on approach to the top terminal limit is okay, and that the lift stops where it
should. (Charge plungers equally spaced on the charge points).
RESET CONFIRMATION: TO CHECK THE RESET AT THE TOP CHARGE POINT; DRIVE THE LIFT
DOWN FROM THE TOP TERMINAL LIMIT. AS THE POSITIVE PICKUP PLUNGER LEAVES THE
CHARGE POINT THE TWO REMAINING UNLIT DISPLAY SEGMENTS FLASH MOMENTARILY.
(THIS INDICATION IS VERY QUICK AND IS ONLY INTENDED FOR ENGINEER PURPOSES).
Note: Creep speed is overridden at this point and the lift runs in bend speed.
Drive the lift down the rail checking the levelling and speeds are satisfactory and the approach to the bottom
terminal limit is okay, and the lift stops where it should.
22
ACORN 80 Installation Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents