Ic Cylinder And Levers - Installation / Removal; Remove Ic Core; Remove Ic Core Lever; Install Ic Core Lever - Assa Abloy Corbin Russwin CL3100 Series Installation Instructions Manual

Grade 1 key-in-lever
Table of Contents

Advertisement

Grade 1 Key-In-Lever VR Lever Lock
CL3100 Series
Installation Instructions
13

IC Cylinder and Levers - Installation / Removal

Corbin Russwin Interchangeable Cores (C6, CL6, CT6, CTP, C7, CL7, CT7)
Small Format Interchangeable Cores SFIC (M08). Schlage LFIC (M69). Yale LFIC (YRC, YRC7)
a

Remove IC Core

1. Insert control key and turn counter clockwise until stop is reached.
2. With key in this position, pull out core.
3. Remove key.
b

Remove IC Core Lever

1. Remove cylinder (as above).
2. Remove 6 lobe security set screw.
3. Use a flat blade screwdriver to rotate cam within lever sleeve 45°
clockwise to align lever catch slot with lever catch button. (See cam
orientation page 7 step 7).
4. Depress catch and remove lever.
c

Install IC Core Lever

1. Assemble lever onto sleeve.
Note
If IC core is available, insert it into the lever first (see 13D).
2. Use a flat blade screwdriver (or, with the IC core in the
lever, use the key and turn to engage the tailpiece and
slot) to rotate cam within lever sleeve 45° clockwise to
align wide slot with lever retainer catch.
3. Push lever until catch engages. Check engagement.
4. Secure with 6 lobe security set screw.
For Installation Assistance contact Corbin Russwin
1-888-607-5703 • techsupport.corbinrusswin@assaabloy.com
Copyright © 2016, 2019, ASSA ABLOY Access and Egress Hardware Group, Inc. All rights reserved. Reproduction in whole
or in part without the express written permission of ASSA ABLOY Access and Egress Hardware Group, Inc. is prohibited.
2
Figure 16
2
Figure 17
Press catch
PRESS CATCH
3
4
2
3
1
Figure 18
10
1
Core Removal
Press catch
PRESS CATCH
4
3
5
Core Lever Removal
OR
Core Lever Installation
FM345 01/19

Advertisement

Table of Contents
loading

Table of Contents