Putting Into Service - LINET Multicare Instructions For Use And Technical Description

Positionable bed for intensive care with scales and without scales
Table of Contents

Advertisement

8 Putting into Service

WARNING!
Risk of injury when working on the bed!
Ensure that the bed is disconnected from the mains connection prior to putting into service, putting out of service
and maintenance.
Ensure that the castors are locked prior to putting into service, putting out of service and maintenance.
CAUTION!
Material damage due to incorrect putting into service!
Ensure that putting into service is performed exclusively by manufacturer´s customer service or trained hospital
personnel.
Set up the bed as follows:
Unpack the bed.
Check the delivery (see Scope of Delivery and Bed Variants).
Remove isolating foil from mains control box (see Accumulator Activation).
Install equipment and accessories.
In case of delivery with dismounted head board and foot board, mount the head board and foot board (see Head Board
and Foot Board).
Set-up the bed only on a suitable floor surface (see Transport).
Ensure the mains cable does not collide or get stretched when adjusting the bed. Check the plug is inserted
correctly.
Do not leave any extension cords or power strips loose on the floor.
Ensure all the required mechanical and electrical prevention mechanisms are available on site.
There is no mains switch on the bed, i.e. the mains cable is the only means to isolate the bed from the mains.
Ensure the mains cable is always accessible.
The plug on the mains cable should only be changed and maintained by qualified and trained service technicians
authorised by the manufacturer.
26
D9U001MC0-0101_16

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Multicare and is the answer not in the manual?

Table of Contents

Save PDF