Page 1
28mm Walkway – Firing Point B28-SF-226 Please read these instructions fully before starting construction. PVA or equivalent glue will be required to stick sections together. Sand paper can be used to gently clean any joints. A sharp modelling knife will be required to remove sections from the sprue. Please use knives with due care and remember to cut away from yourself at all times.
Page 2
Take the pieces shown above from the sprue. Attach the brackets to the front assembly using the higher end of the bracket. Glue the walkway section into position. Add the rear support piece, with the etched detail facing into the model. Attach the lower end of the brackets to the lugs.
Need help?
Do you have a question about the B28-SF-226 and is the answer not in the manual?
Questions and answers