Carrier Aero 39MN Series Installation, Start-Up And Service Instructions Manual page 269

Indoor and weathertight outdoor air handlers
Table of Contents

Advertisement

NOTE: To avoid injury to personnel and damage to equipment or
property when completing the procedures listed in this start-up
checklist, use good judgment, follow safe practices, and adhere to
the safety considerations/information as outlined in preceding sec-
tions of this Installation Instruction document.
Once start-up is complete, send a completed copy of this checklist to the applicable
Sales Engineer and Post Sale Product Marketing at 39MW@carrier.utc.com
I. PRELIMINARY INFORMATION
MODEL NO.JOB NAME ________________________
SERIAL NO. ADDRESS ________________________
START-UP DATE _____________________________
TECHNICIAN NAME ___________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
SINGLE POINT POWER OPTION
Are power connections to the Single Point Power Enclosure made and checked?
Are all power harness connections made at unit splits?
Are all wiring terminals tight?
CONTROLS
Are control(s) and indoor fan control wiring connections made and checked?
Are all wiring terminals tight? (including power to fan motors, heaters, etc.) (Pg 141)
AIR HANDLER
Remove packaging and any construction debris.
Inspect for shipping and/or handling damage, make claims as required. (Pg 84)
Inspect all panel flanges for damage. Panel flanges should be smooth with no sharp bends.
Are all corner connectors and frame to channel joints smooth with no cracks, large bumps
or depressions in the caulk?
Are any door latches loose or damaged? If so, tighten or replace
AT EACH SECTION JOINT, VERIFY:
IS ROOF SLIDER INSTALLED ON TOP OF
ROOF?
IS END ROOF BRACKET MOUNTED AND
GASKETED TO EACH SIDE OF ROOF
JOINT?
ARE BASE RAILS BOLTED ON BOTH
SIDES?
ARE UPPER SIDE TOP BRACKETS
UNDER ROOF BOLTED AND
TIGHTENED?
ARE BOTH SECTION TO SECTION
JOINTS UNIFORMLY GASKETED?
IS GASKET COMPRESSED AND A
SECTION-TO-SECTION SPLIT CAULKED
ALONG ENTIRE LENGTH OF SEAM?
IF CCH ATTACHED, VERIFY CCH TO UNIT
SEALS:
IS ROOF BRACKET SLIDER INSTALLED
ON TOP OF ROOF?
ARE SIDE FLASHINGS INSTALLED ON
BOTH SIDES?
IS CCH TO UNIT BASE JOINT CAULKED
PER INSTRUCTIONS?
START-UP CHECKLIST — 39MW OUTDOOR AHU UNITS
JOINT 1
(PG 90)
(Y/N) _____
(PG 86)
(Y/N) _____
(PG 86-87) (Y/N) _____
(PG 90)
(Y/N) _____
(Y/N) _____
(PG 86)
(Y/N) _____
CCH 1
(PG 117)
(Y/N) _____
(PG 116)
(Y/N) _____
(PG 117)
(Y/N) _____
JOINT 2
JOINT 3
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
CCH 2
CCH 3
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
CL-3
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
JOINT 4
JOINT 5
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
JOINT 6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aero 39mw series

Table of Contents