Connecting Cables For Analog Setpoints; Connecting The Cable For The External Fast Stop - SMA SUNNY CENTRAL 500CP-JP Installation Manual

Hide thumbs Also See for SUNNY CENTRAL 500CP-JP:
Table of Contents

Advertisement

SMA Solar Technology AG
4. Attach the network cables to the cable support rail using a cable tie. This will prevent the network cables from
being pulled out inadvertently.
5. Mount the panels (see Section 7.2.1, page 41).
5.6.4

Connecting Cables for Analog Setpoints

If the setpoints for active power limitation and reactive power control are not transmitted via the network, there are
terminals in the inverter for connecting external setpoints. The inverter processes standard analog signals from 4.0 mA
to 20.0 mA.
Cable requirement:
☐ The cable used must be shielded.
Procedure:
1. Disassemble the panels (see Section 7.2.1, page 41).
2. Insert the cables (see Section 7.1, page 41).
3. Connect the cables in accordance with the circuit diagram (see Section 7.4, page 50).
4. Secure the cables on the cable support rail. This will prevent the cables from being pulled out inadvertently.
5. Mount the panels (see Section 7.2.1, page 41).
5.6.5

Connecting the Cable for the External Fast Stop

If required, you can connect an external fast stop in accordance with the circuit diagram. The fast stop can be
operated by means of an internal or external supply voltage.
Shortfall of external supply voltage
If there is an external supply voltage between 18.5 V to 24.0 V, the inverter will continue to operate in its current
operating state. If the external supply voltage falls below 18.5 V, the inverter switches from the current operating
state to the operating state "Stop". If the temperature inside the inverter exceeds the temperature limit, a supply
voltage of 20.0 V to 24.0 V must be present to continue operating the inverter in its current operating state.
Temperature limit: +60°C
• Ensure that the external supply voltage is between 20.0 V and 24.0 V.
Cable requirement:
☐ The cable used must be shielded.
Additional cable requirements for internal supply voltage:
☐ Maximum cable length with cable cross-section: 130 m / 2.5 mm²
☐ Maximum cable length with cable cross-section: 80 m / 1.5 mm²
Requirements:
☐ A switch must be used that can interrupt the supply voltage.
Procedure:
1. Disassemble the panels (see Section 7.2.1, page 41).
2. Insert the cables (see Section 7.1, page 41).
3. Connect the cables in accordance with the circuit diagram (see Section 7.4, page 50).
4. Secure the cables on the cable support rail. This will prevent the cables from being pulled out inadvertently.
5. Mount the panels (see Section 7.2.1, page 41).
Installation Manual
5 Installation
SCCP-JP-B1-IA-en-21
33

Advertisement

Table of Contents
loading

Table of Contents