SMA Solar Technology AG
Additionally required mounting material (not included in the scope of delivery):
☐ Clean cloth
☐ Ethanol cleaning agent
Procedure:
1. Disassemble the panels (see Section 7.2.1, page 41).
2. Disassemble the protective covers (see Section 7.2.2, page 42).
3. Prepare the cables for connection (see Section 7.3, page 45).
4. Clean the non-tin-plated contact surfaces in the connection area with the non-woven abrasive until they have a
light metallic sheen.
5. Clean all contact surfaces in the connection area using a clean cloth and ethanol cleaning agent and do not
touch the contact surfaces after cleaning.
6. Connect the cables in accordance with the circuit diagram. Only use the screws, nuts and washers included in the
scope of delivery and make sure that the screw heads always point forwards.
7. Secure the cables on the cable support rail. This will prevent the cable from being pulled out inadvertently.
8. Mount the protective covers (see Section 7.2.2, page 42).
9. Mount the panels (see Section 7.2.1, page 41).
5.6
Cables for Communication, Control, Supply Voltage and Monitoring
5.6.1
Connecting Optical Fibers with Subscriber Connector
Figure 9: Position of the splice box
Position
Designation
A
Splice box
Installation Manual
5 Installation
SCCP-JP-B1-IA-en-21
29