Regency City ACV40E Series Owners & Installation Manual page 43

Zero clearance direct vent gas fireplace
Table of Contents

Advertisement

Unit Installation with Horizontal
Termination
102mm x 175mm
Flueing
(Flex Vent Systems)
Minimum Vent Clearances
to Combustibles
* Clearances noted below must be maintained;
except when passing through a wall, ceiling or at
the termination where the use of a firestop or wall
thimble reduces clearance to 25mm.
Horizontal Top*
76mm*
Horizontal Side
51mm
Horizontal Bottom
51mm)
Vertical Vent
51mm
Below are the recommended framing dimensions
(inside measurements) for the 102mm x 168mm
rigid vent terminations - for use with a firestop or
wall thimble.
Recommended Framed Opening Size
Flue Size
Framing Size
102mm x 175mm
254mm x 254mm
1. Locate the unit in the framing, rough in the gas
(preferably on the right side of the unit). Locate
the centerline of the termination and mark wall
accordingly. Cut an square hole in the wall - see
chart (inside dimension).
Note: I f installing termination on a siding covered
wall, a vinyl siding standoff or vinyl furring
strips must be used to ensure that the
termination is not recessed into the siding.
a l l
i d e W
O u t s
Furring
Strips
2. Level the fireplace and fasten it to the framing
using nails or screws through the nailing strips.
3. Assemble the vent assembly by applying Mill
Pac to the inner flue collar of the termination
and slipping the inner flex liner over it at least
35mm. Fasten with the 3 screws (drilling pilot
r i e u r
holes will make this easier). Apply Mill-Pac to
e x t é
M u r
the outer flex pipe and slip it over the outer flue
collar of the vent terminal at least 35mm and
fasten with the 3 screws.
Fourrures en bois
NOTE: Horizontal sections must be sup-
ported at intervals not exceeding
0.9 meter. (Flame picture and
performance will be affected by
sags in the liner).
4. Separate the 2 halves of the wall thimble and
securely fasten the one with the tabs to the
outside wall making sure that the tabs are on
top and bottom. Fasten the other thimble half
to the inside wall. The thimble halves slip inside
each other and can be adjusted for 51mm x
102mm or 51mm x 152mm walls.
5. Slip the assembled liner and termination as-
sembly through the thimble making sure the
termination cap faces up (there are markings
on the cap indicating which way is up). This will
position the termination cap with proper down
slope for draining water. Fasten the cap to the
outer wall with the 4 supplied screws.
6. Pull the centre inner and outer flex liner out
enough to slip over the flue collars of the fire-
place. (You may wish to cut the liner shorter
to make it more workable.) Do not bend liner
more than 90
collars a minimum of 35mm
7. Apply Mill Pac over the fireplace inner flue
collar and slip the inner flex liner down over it
and attach with 3 supplied screws.
8. Do the same with the outer flue collar and outer
flex liner.
9. Apply a bead of silicone between the thimble
and termination and around the outer edge of
the terminal at the wall in order to keep the
water out.
IMPORTANT: Do not locate termination hood
where excessive snow or ice buildup may
occur. Be sure to check vent termination
Furstrp.eps
area after snow falls, and clear to prevent
accidental blockage of flueing system. When
using snow blowers, make sure snow is not
see also c34020a.eps
directed towards vent termination area.
Screws
(3 per
connection)
furstrpf.eps
french
. The liners must slip over the
o
102mm dia. flue pipe
with spring spacer
173mm
dia. air intake
Wall Thimble 2 pieces
254mm
Outer Diameter)
installation
ASTROCAP
DIMENSIONS (946-523/P)
(279mm)
NOTE: A minimum of 305mm vertical off
the top of the unit is required before any
horizontal runs can start.
51mm x 102mm or
51mm x 152mm stud
Termination
Cap
Screws
(4 per
connection)
ACV40E City Series |
(279mm)
of hole
C L
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

City acv40engCity acv40elpCity acv40eulpg

Table of Contents