Commissioning - Kessel Minilift S Original Operation Manual

Hide thumbs Also See for Minilift S:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 25
5.

Commissioning

▶ Check whether the steps explained in the chapter on assembly have been
carried out correctly.
▶ Clear any building waste from the tank if necessary.
▶ Connect the system to the power supply. Lift the float switch to check whether
the submersible pump starts automatically.
✓ Connecting the connection cable(s) to the power supply switches the system
on.
L Dry running of the pump must be avoided.
42
Installation and operating manual
016-083_02

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ktp 300

Table of Contents