4. Ground the Switch

2
1
1
Ensure the rack is properly grounded and in compliance
with ETSI ETS 300 253. Verify that there is a good electrical
connection to the grounding point on the rack (no paint or
isolating surface treatment).
2
Attach the grounding wire #14 AWG to the grounding point
on the switch rear panel. Then connect the other end of the
wire to rack ground. For details on grounding the switch
with a 12 VDC PSU in an Open Rack, refer to the Edgecore
ORSA-1U Open Rack Tray Set Installation Guide.
Caution:
The earth connection must not be removed
unless all supply connections have been disconnected.
Attention:
Le raccordement à la terre ne doit pas être retiré
sauf si toutes les connexions d'alimentation ont été
débranchées.

5. Connect Power

2
1
Install one or two AC or DC PSUs in the switch.
The switch supports up to two PSUs that must have the
same matching airflow direction as the installed fan trays.
2
Connect an external AC or DC power source to the PSUs.
3
1
2
1
36
75 VDC Return (blue
wire)
2
-36
-75 VDC (brown
wire)
1
4
3
Chassis Ground (yellow-
green wire)
4
Open Rack tray connector
for 12 VDC PSU
Caution:
Use a UL/IEC/EN 60950-1 certified power supply
to connect to a DC converter, and a #14 AWG (for 36–75 VDC
PSU) or #10 AWG (for 12 VDC PSU) wire to connect to a DC
PSU.
Attention:
Utilisez une alimentation certifiée UL/IEC/EN
60950-1 pour le connecter à un convertisseur CC et un câble
AWG #14 (pour -36 VDC à -72 VDC) ou AWG #10 (pour 12
VDC PSU)pour vous connecter à une alimentation CC.
6. Verify Switch Operation
1
1
Verify basic switch operation by checking the system LEDs.
When operating normally, the PS1/PS2 and Fan LEDs should
all be on green.
7. Perform Initial System Boot
1
If the network operating system (NOS) installer is located on
a network server, first connect the RJ-45 Management
(Mgmt) port to the network using Category 5, 5e or better
twisted-pair cable. (Not required if the NOS installer is
located on attached storage.)
2
Boot the switch. Wait for the ONIE software to locate and
execute the NOS installer, and then wait for the installer to
load the NOS software image.
Subsequent switch boots will bypass ONIE and directly run
the NOS software.
Note:
Refer to the network operating system (NOS) installer
and NOS documentation for details on software options and
set up for ONIE.
8. Connect Network Cables
1
For the RJ-45 Management port, connect 100-ohm Category
5, 5e or better twisted-pair cable.
2
Connect DAC cables to the QSFP+ slots. Or first install QSFP+
transceivers and then connect fiber optic cabling to the
transceiver ports.
The following transceivers are supported:
40GBASE-CR4
40GBASE-SR4
40GBASE-LR4