L.A. Spas In-Fit 13 SL Manual page 18

Table of Contents

Advertisement

in.yt-12 connections (Export only)
230V Single-phase
(1x32A)
Connect jumpers
(brown wires)
P7 ---> P13
P10 ---> P74
230V Three-phase*
(3x16A)
Connect jumpers
(brown wires)
P7 ---> P10
P11 --->P13
* For Dual and Three-phase connections, make sure to change the proper phase setting in the
6.
Secure the wire connections. Push the wires into the equipment control pack.
7.
Close the cover on the equipment control and tighten the screws.
8.
Electrical hook up is now complete. Do not re-attach the front cabinet panel yet.
For Dual and Three phase connections: Change to proper phase setting in the control
panel. For In-Fit 13 SL, press and hold the Program Key until b32 is shown on the display.
Change to the proper breaker and phase settings. For all others, see Operation Instruc-
tions on how to enter the Electrical Configuration section. When prompted, press and hold
the key next to "confirm" to enter the menu where electrical setting can be changed.
18
Electrical Configuration section of the control panel.
230V Dual-phase*
(2x16A)
Connect jumpers
(brown wires)
P7 ---> P10
P13 ---> P74
230V Three-Phase*
Delta
Connect jumpers
(brown wires)
P7 ---> P10
P13 ---> P74
In-Fit Exercise Pools