Download Print this page

Valmont Industries INGAL CIVIL SoftStop Product Manual page 28

Tangent end terminal

Advertisement

SoftStop
9.0 SoftStop Installation Checklist
Customer:
Project:
Barrier ID:
Checked By:
Is the assembled Anchor post installed in the correct orientation with the sloped side
facing the terminal and within tolerance (102 +0/-6 mm measured from ground level to the top
of the Anchor Angles)
Is Anchor Keeper Plate installed in correct con guration on Anchor post (Step 9)
Have Anchor post Angles been correctly bolted to the Anchor post (Step 10)
Is the Ground Strut bolted to the Anchor post and post 1 (Step 10)
The SoftStop head is bolted to post 1 (Step 7)
Are SYT posts positioned at locations 1 & 2, with yield holes approximately centred at nished
grade line
Are posts 2 through 8 at the correct height of 813mm ±20mm above ground level
Are the rails secured to posts 3 through 8 (posts 3 and 4 for the TL2 con guration)
Ensure rst rail is NOT secured to post at location 2
Have the rails been joined with M16x32mm splice head bolts
Are all splice bolts, post bolts and other fasteners snug tight
Do the standard W-Beam rails form a smooth line vertically and horizontally when viewed along
the system, with no curved rails
Is all back- lled material around each post suitably compacted
Is the area below the guardrails free from hazards so that the SoftStop head can travel freely upon
impact
Ensure any minor damage been repaired using two coats of an organic zinc rich paint
When installed on a flare, ensure flare rate is no greater than 1:25 (610mm offset from straight
barrier over full length for TL3 con guration, 305mm for TL2 con guration)
Ensure SoftStop impact head has no more than 58mm of upward tilt, measured over length of
impact head (points A & B - refer to Figure 12, page 15).
Disclaimer:
Important Note: The conformity of the installation is the responsibility of the installation contractor, and Ingal Civil Products accepts no liability for
or in connection with any installation that is outside of the speci cations of this manual or the Road Controlling Authority. For more information,
please refer to our Standard Terms and Conditions of Sale available on our website: www.ingalcivil.co.nz.
Release 06/19
® Tangent End Terminal
Signed:
Terminal Type:
MASH TL2
Date:
MASH TL3
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
28

Advertisement

loading