Preparing For Installation; Verify Customer Order; Physical Inspection; Emi Protection - GE LOGIQ C3 Premium Basic Service Manual

Hide thumbs Also See for LOGIQ C3 Premium:
Table of Contents

Advertisement

GE H
EALTHCARE
D
5273008-100, R
IRECTION
Section 3-4

Preparing for Installation

3-4-1

Verify Customer Order

Compare items received by the customer to that which is listed on the delivery order. Report any items
that are missing, back ordered or damaged.
3-4-2

Physical Inspection

3-4-2-1
System Voltage Settings
Verify that Docking Cart is set to the correct voltage.
The Voltage settings for the LOGIQ C3/C5 Premium is found on a label to the right of the Power switch
and External I/O, on the rear of the system.
Connecting a LOGIQ C3/C5 Premium to the wrong voltage level will most likely destroy
WARNING
WARNING
it.
3-4-2-2
Video Formats
Check that the video format is set to the locally used video standard, NTSC or PAL.
3-4-3

EMI Protection

This Unit has been designed to minimize the effects of Electro Magnetic Interference (EMI). Many of the
covers, shields, and screws are provided primarily to protect the system from image artifacts caused by
this interference. For this reason, it is imperative that all covers and hardware are installed and secured
before the unit is put into operation.
8
EVISION
Chapter 3 System Setup
VIVID FIVE
B
S
M
ASIC
ERVICE
ANUAL
3 - 7

Advertisement

Table of Contents
loading

Table of Contents