Download Print this page

Hach Polymetron 9610sc SiO2 Installation Manual page 38

Hide thumbs Also See for Polymetron 9610sc SiO2:

Advertisement

3. Select STD SOLUTION and enter the standard value in ppb.
4. Select a schedule option for calibration.
Option
Description
TIME BASE
Sets the interval between calibrations. Options: DAYS or
HOURS.
WEEK DAY
Selects the day or days of the week for calibration when
TIME BASE is set to DAY.
TIME
Sets the time of day for calibration when the TIME BASE is
set to DAY.
SET INTERVAL Sets the interval between automatic calibrations in hours
when the TIME BASE is set to HOURS.
Start a calibration manually
1. Push cal, then select START MANUAL CAL.
2. The type of calibration is displayed. Push enter to start the
calibration.
3. The measurement status is displayed. Select YES to interrupt the
current measurement cycle and start the calibration immediately.
Select NO to wait until the current measurement cycle has completed
before the calibration starts.
English 19

Advertisement

loading