Commissioning of the Vapor Generator
NOTE : The operating instructions folder contains a 3-page operating instruction to be hung in the workspace.
A) Controls Which Must Be Done Before Start-Up
0
1 - Perform the hardness analysis of the water to be used. It must be 0
F !!!
0
Before starting the steam generator, hardness analysis of the water must be performed and 0
F should be seen. The
higher the quality of the water you use, the longer the service life of your steam generator will be. When performing
hardness analysis;
* Fill the sample cup through the sampling valve to the 5 ml line. (Figure 1)
* Hold the indicator buffer solution upright, drip 3 drops and shake. (Figure 2)
* Test is completed when the water in the sample cup is green. (Figure 3)
25
Figure 1
Figure 2
Figure 3