2. water and cable entry points
Cable entry
Pipe entry
Pipe entry
40
TOP
85
13
Datum point
56
1 The datum point has
32
2 The top and bottom of the
3 The hatched areas are
4 Ensure screw fixings
20
19
23
Fixing points (x3)
important Points
been taken as the centre
position of the water inlet
pipe when used as a back
entry.
case walls have thinned
sections for ease of
removal to accept top or
bottom water inlet.
case cutouts to allow
cable and pipe access.
do not puncture buried
cables.
Cable entry
173
211