Download Print this page

Graco Fire-Ball Series Instructions-Parts List Manual page 7

Topper units
Hide thumbs Also See for Fire-Ball Series:

Advertisement

6" (152.4 mm)
supply lines
(through wall)
master air valve
5' (1524 mm)
clearance
for plumbing
The Typical Installation shown above is only a guide
for selecting and installing this system. It is not an
actual system design. Contact your Graco
representative for assistance in designing a system to
suit your particular needs.
Positioning the Elevator
1. Position the elevator where the ceiling is at least
8 ft. (2.6 m) high. The elevator is 90 in. (2.4 m)
when fully raised; complete dimensions are shown
on page 18.
2. Provide adequate space in front of the elevator for
changing drums and in back and on the side for
plumbing.
Installation
3" (76 mm)
1" (25 mm)
bleed-type
high pressure
fluid shutoff valve
supply lines
(from ceiling)
Mounting the Elevator
1. Secure the elevator base (A) to the mounting base
(102), using the screws (104), lockwashers (103),
and nuts (105). See Fig. 3.
2. Bolt the mounting base (102) to the floor for
stability.
3. Be sure that the elevator is level. Loosen one or
two screws (104) on the elevator base and place
shims under the base, if necessary.
4. Place the inductor plate (2, 18, or 22) on the
mounting base (102).
5. Loosen the screws (68) of both support brackets
(83). Slide the support (64) down far enough to
allow installation of the pump in the inductor plate.
Tighten the bracket screws lightly.
mounting
holes
0721
306556
7

Advertisement

loading

This manual is also suitable for:

President series226013226018244637204490